Commercial building demo

Sun Avenue Tower S4 · 14 floors · 28,400 m² · 22 tenants
Live demo data
Period
Scope

Load profile hover the chart

Sub-metered load click a system

Select a system to see its breakdown and current status.

Consumption by floor click a floor

Floor detail

Active alarms click to acknowledge

Demand & tariff exposure

Off-peakNormalPeak tariff

Energy flow · source to end use

Widths are proportional to kWh. Hover a node to trace its chain; hover a ribbon for a single flow.
Zone

Zone detail

24-hour trend hover for values

Sensor fleet click a column to sort

ZoneCO₂PM2.5TVOC TempRHIAQStatus

Ventilation response

Rule chain raises AHU fresh-air damper when zone CO₂ crosses 1000 ppm and holds for 15 minutes before releasing, so the plant does not hunt.

Occupancy pattern click a cell

empty → full
Click any hour to see headcount, load and comfort at that moment.

Space utilisation by area type

Utilisation is people-hours against capacity-hours. Anything under 40% is a candidate for consolidation or sublease.

Thermal comfort · PMV distribution

ISO 7730 category B targets PMV between −0.5 and +0.5. Zones outside the band drive most comfort complaints.

Meeting rooms · booked vs used

RoomBooked hOccupied hUtilisationGhost bookings
Billing period

Tenant consumption click a row

TenantFloorkWhPeak kW kWh/m²Amount

Tenant detail

Cost allocation

Common-area energy is apportioned by leased area. The split is recalculated each period from metered data, not from a fixed schedule.

Invoice status

Invoices generate on the 1st and send automatically.
Energy use intensity
142 kWh/m²·yr
HCMC Grade-A median 165
Chiller efficiency
0.62 kW/ton
Design 0.65
Weather-normalised
−6.1 %
CDD-adjusted vs last year
Scope 2 · YTD
986 tCO₂e
Location-based

End-use intensity vs benchmark

Bars show this building; the value column reads actual against the HCMC Grade-A median.

Consumption vs cooling degree days hover a month

kWh per m²Cooling degree days

Reduction targets

Power quality

Power factor
0.94
Voltage THD
3.1 %
Current unbalance
1.8 %
Reactive penalty risk
None
EVN penalises power factor below 0.90. Continuous measurement makes the exposure visible before the bill arrives.

Green building credit tracking · LOTUS / LEED O+M

CreditEvidence sourceCoverageStatus
Show

Asset register click an asset

AssetRuntime hHealthNext serviceState

Asset detail

Predictive alerts

Runtime balance · lead/lag rotation

Uneven runtime shortens the life of the lead unit. The sequencer rotates weekly to keep hours within 5%.
Controls are read-only until armed. Arming is logged against your user and expires after 10 minutes.

BMS mimic · chiller plant & AHU

Smart controls · RPC to device

Chiller plant mode
Lead/lag sequencing
Chilled water setpoint
Supply temperature
7.0 °C
AHU-04 supply air
Zone L8 meeting rooms
14.0 °C
Fresh air damper
Minimum outside air position
30 %
AHU-04 fan
Variable speed drive, currently 68%
Demand response mode
Sheds non-critical load on EVN peak signal
Lighting schedule override
Common areas, floors 1–14

Command audit trail

No commands issued this session.

Control safety

Interlocks and trips stay in the BMS controller, never in the cloud. The platform issues setpoint and enable commands only — if the link drops, local control continues on its last valid setpoint.

Every write is an RPC with a device-side acknowledgement. An unacknowledged command raises an alarm rather than failing silently.
Vinergy

Manufacturing demo

Injection moulding plant · 4 lines · 38 monitored assets
Live demo data
Shift
Period

Load profile hover the chart

ActualBaseline

Line detail

Consumption by production line

Load profile · 24 hours by shift

Shift A Shift B Idle

Asset status · Modbus / MQTT / OPC-UA

Load factor
0.74
Idle share
8.6 %
Energy cost per unit
2,436 ₫
Reactive energy
418 kVArh

Consumption by line click a line

Active alarms click to acknowledge

Energy flow · incomer to product and loss

The right-hand column separates energy that reached product from energy that did not — idle draw and compressed air leakage are the two recoverable streams.
Specific energy · plant
0.87 kWh/unit
Baseline 0.92 at commissioning
Compressed air
0.118 kWh/Nm³
Best practice 0.100
Estimated leak rate
17 %
≈ 118 tr₫/yr
Voltage THD
4.8 %
IEEE 519 limit 5%

Specific energy by product

Normalising by product removes mix effects — raw kWh alone hides which runs are actually inefficient.

Compressed air · weekend base load test

Production stopped Saturday 06:00. Residual draw is leakage — the flat line is the leak rate.

Power quality by feeder

FeederPFTHD-VUnbalancekVArhState

Demand charge exposure

Contracted demand
1,600 kW
Peak this month
1,410 kW
Headroom
11.9 %
Peak-hour share
28.4 %
Peak-hour tariff in Vietnam runs roughly 2× normal rate. Shifting one batch out of the 09:30–11:30 window is usually the cheapest saving available.
Line 2 · load
412 kW
Running · 6h 14m uptime
Units this shift
8,412
On target
kWh per unit
0.94
↑ 8% vs line average
Idle energy
41 kWh
Between-batch waste

Machine breakdown · Line 2

Energy per unit · last 7 days

Dashed line marks the efficiency baseline agreed at commissioning.
Rule chains evaluate every telemetry message — alarm latency is under a minute from meter to phone.
Open anomalies
4
2 critical · 2 warning
Mean detection time
38 s
Meter to notification
Avoided downtime
14 h
This quarter

Anomaly log

TimeAssetConditionRuleSeverityState

Alarm routing

Critical
Zalo + call
Warning
Email + app
Escalation
After 10 min
Auto-clear
On recovery
Controls are read-only until armed. Arming is logged against your user and expires after 10 minutes.

Plant mimic · compressed air & line feeders

Smart controls · RPC to device

Compressor sequencing
Lead unit rotation
Air pressure setpoint
System header
6.5 bar
Comp-02 enable
Standby unit, starts on demand
Peak-shaving mode
Sheds Line 3 above 1,500 kW
Demand limit
Trigger threshold
1500 kW
Idle shutdown
Stops barrel heaters after 20 min idle

Command audit trail

No commands issued this session.

Control safety

Machine safety functions are never exposed. Commands are limited to enables, setpoints and sequencing — emergency stops, guards and pressure relief remain hardwired.

Writes go to the PLC through the gateway, and the PLC validates every value against its own limits before acting. The cloud can request; only the PLC decides.

OEE by line click a line

LineAvailabilityPerformance QualityOEEState

Downtime pareto · 30 days

Eighty percent of lost minutes come from the top three causes. Changeover is the largest and the most controllable.

Energy per unit vs throughput hover

kWh/unitUnits/hour

Shift comparison

Night shift runs 9% higher specific energy at similar output — usually setpoint drift or machines left idling between batches.

Changeover analysis

LineChangeoversAvg durationBestEnergy per changeoverAnnual cost
Vinergy

Data centre demo

Tier III colocation · 2 halls · 96 racks
Live demo data
Scope
Period

PUE trend hover the chart

PUEDesign target 1.45

Alarms click to acknowledge

PUE trend · 24 hours

Design target 1.45 · dashed. Night-time free cooling visible after 22:00.

Facility load split

Escalation queue · 24/7 on-call

Power flow · utility to IT load

The gap between facility input and IT load is the PUE overhead, broken down by where it is actually consumed.
Racks monitored
96
Inlet + outlet + RH
ASHRAE breaches
2
Above A1 recommended
Avg cold aisle
22.8 °C
Within envelope
Hall RH
47 %
No condensation risk

Hall B · rack inlet temperature click a rack

18 °C → 32 °C
Click any rack to see inlet, outlet, load and airflow for that position.

Racks outside envelope

RackInlet °COutlet °CΔTRH %State

Power chain · utility to rack

Utility feed A
1,420 kW
Utility feed B
1,221 kW
UPS load
64 %
Generator
Standby
Every node in the chain is a metered device — losses are measured, not estimated.
PUE · 12-month
1.46
Live 1.42 · design 1.45
Partial PUE · cooling
1.33
Mechanical subsystem only
WUE
1.8 L/kWh
Evaporative cooling season
CUE
0.88 kgCO₂e/kWh
Vietnam grid factor applied

Rack density distribution

Design is 6 kW/rack average. The tail above 10 kW drives the hot spots on the environment page.

UPS efficiency vs load

Marker shows current operating point at 64% load. Efficiency falls sharply below 30% — relevant when planning redundancy.

Environmental compliance · ASHRAE TC 9.9

MetricValueEnvelopeState

Cooling performance

Chiller COP
5.4
Return air ΔT
11.6 K
Free cooling hours
318 h/yr
Redundancy
N+1 held
A low ΔT usually means bypass air, not a cooling shortage — worth checking before adding capacity.
Controls are read-only until armed. Arming is logged against your user and expires after 10 minutes.

Facility mimic · cooling & power train

Smart controls · RPC to device

CRAC group mode
Hall B, units 1–6
Cold aisle setpoint
Hall B target inlet
22.0 °C
CRAC-3 fan speed
Manual override active
72 %
Free cooling enable
Ambient below 18 °C
Hall B containment damper
Hot aisle isolation
Generator
Weekly test scheduled Sunday 02:00

Command audit trail

No commands issued this session.

Control safety

UPS transfer and generator start are excluded from remote control by design — these are single points of failure for the whole facility and belong to the on-site EPMS with local confirmation.

Setpoint writes are rate-limited to one change per node per minute so an operator cannot oscillate the cooling plant from a phone.

Capacity headroom by constraint

The binding constraint is cooling, not space or power. Selling more rack space without adding cooling would strand it.

IT load growth & exhaustion forecast hover

Actual IT loadProjected

Hall utilisation click a column to sort

HallRacksOccupied kW usedkW designStranded

UPS & battery

UPS efficiency
96.4 %
Battery autonomy
11.4 min
Last discharge test
14 Jul
Weakest string
String 3 · 91%
Autonomy is calculated from measured load, not from the nameplate rating — at design load this bank would give 7.8 minutes, not the 15 on the label.
Vinergy

Solar & wind demo

Portfolio · 6 sites · 48.2 MW installed
Live demo data
Technology
Period

Output vs expected hover the chart

ActualExpected from irradiance

Site detail

Sites click a site

Output vs irradiance · today

Actual output Expected from irradiance

Underperformance alarms click to acknowledge

Yield flow · available resource to exported energy

Starts from theoretical yield at measured irradiance. Each branch is a loss mechanism; only soiling and curtailment are addressable in the short term.
Ninh Thuận solar
12.8 MW
18 MW installed · 24 inverters
Irradiance
784 W/m²
Weather station on site
Module temp
51.2 °C
Derating above 45 °C
Soiling loss
3.4 %
Cleaning due

Inverter fleet

InverterOutput kWDC/AC ratioTemp °CYield todayState

Wind site · LiDAR measurement

Wind speed · 100 m
8.4 m/s
Direction
142°
Turbulence intensity
0.11
Shear exponent
0.19
Nacelle LiDAR profiles ingested alongside SCADA for power-curve verification.
Availability · 30 days
97.1 %
Contractual minimum 95%
Lost production
86 MWh
≈ 241 tr₫
Open work orders
3
1 scheduled today

Downtime events · 30 days

SiteAssetStartedDurationLost MWhCause
Availability is calculated from telemetry, not from operator reports — the numbers reconcile with the PPA.
Specific yield · YTD
1,412 kWh/kWp
P50 estimate 1,380
Temperature-corrected PR
85.1 %
Raw PR 82.6%
Capacity factor
19.4 %
Solar portfolio
Curtailment loss
2.8 %
Grid-instructed

Actual vs P50 · month by month

Actual P50 estimate

Loss waterfall · irradiance to grid

Each bar is the share of theoretical yield lost at that stage. Soiling and curtailment are the two you can act on.

Site benchmarks

SitekWh/kWpPR %CF %Avail %

Wind · power curve verification

Measured vs warranted
−2.4 %
Capacity factor
34.1 %
MTBF
1,840 h
MTTR
6.2 h
Nacelle LiDAR gives free-stream wind speed, so power curve deviation can be claimed against warranty with defensible data.
Controls are read-only until armed. Arming is logged against your user and expires after 10 minutes.

Plant mimic · inverters to grid connection

Smart controls · RPC to device

Plant controller
Active power regulation
Active power limit
Curtailment setpoint
100 %
Reactive power setpoint
Grid code Q at night
0 kVAr
Power factor target
Point of common coupling
0.98
INV-22 enable
Currently offline — comms fault
Night-time Q compensation
STATCOM mode after sunset

Command audit trail

No commands issued this session.

Control safety

Curtailment commands from the grid operator take priority over anything set here — the plant controller enforces that hierarchy locally, not the dashboard.

Turbine yaw, pitch and brake are not exposed. Remote control is limited to derate, enable and reset; anything touching mechanical safety stays with the turbine controller.

Day-ahead forecast vs actual hover

ActualDay-ahead forecast

Forecast accuracy by horizon

Imbalance exposure is priced against day-ahead nomination, so accuracy at the 24-hour horizon is the number that costs money.

Grid compliance

RequirementMeasuredLimitState

Curtailment events · 30 days

Curtailment is grid-instructed and compensable under some PPAs. Metered records are what make a claim defensible.

Revenue & settlement

SiteMWhAvg price RevenueImbalance costNet
Môi trường demo · dữ liệu minh hoạ
Demonstration environment · representative data, not client records.